Search Result of Ex-Post Evaluation Report

27 results

(Type of Assistance = T:Technical Cooperation, L:ODA Loan, G:Grant Aid)
(Year* = Fiscal Year in Japan)

Type of Assistance Project Start Year* Evaluation Year* Country Sector/Theme Project Name Ex-Post Evaluation Report
T20092015PakistanPrimary EducationProject for Promotion of Student-Centered and Inquiry-Based Science Education(PDF/246KB)
T20082014PakistanEnvironment IssueThe Project for Establishment of Environmental Monitoring System(PDF/823KB)
T20062015PakistanBasic HealthcareEPI/Polio Control Project(PDF/332KB)
T20062012PakistanHealth / Health CareThe Tuberculosis (TB) Control Project(PDF/392KB)
T20042009PakistanGovernment / GeneralThe Project for Improvement of Public Administration for Local Governments in Punjab(PDF/69KB)
T20022009PakistanMachine Tool IndustryThe Project on Balancing and Modernization of Workshop Facilities at the Pakistan Industrial Technical Assistance Centre (PITAC)(PDF/80KB)
L20052015PakistanElectrical PowerLoad Dispatch System Upgrade Project(PDF/389KB)
L19962014PakistanSecondary EducationBalochistan Middle Level Education Project(PDF/703KB)
L19962008PakistanElectrical PowerGhazi Barotha Hydropower Project (2)(PDF/266KB)
L19962012PakistanAgricultural EngineeringNational Drainage Program Project(PDF/495KB)
L19952008PakistanElectrical PowerGhazi Barotha Hydropower Project (1)(PDF/266KB)
L19952010PakistanElectrical PowerSecondary Transmission Lines and Grid Stations Project(PDF/1MB)
L19942008PakistanWater SupplyKarachi Water Supply Improvement Project(PDF/260KB)
G20102015PakistanWater Supply、Water Resources DevelopmentThe Project for Expansion of Water Supply System in Faisalabad(PDF/1MB)
G20102015PakistanSewerageUrgent Rehabilitation Project for Sewerage and Drainage System in Lahore(PDF/1MB)
G20092014PakistanNew / Renewable EnergyThe Project for Introduction of Clean Energy by Solar Electricity Generation System(PDF/495KB)
G20082015PakistanWater Supply、Water Resources DevelopmentThe Project for Improvement of Water Supply System in Faisalabad(PDF/1MB)
G20062010PakistanTransportation / Traffic / GeneralThe Project for the Enhancement of Training Capabilities of Construction Machinery Training Institute(PDF/202KB)
G20062014PakistanRoadsThe Project for the Improvement of Kararo-Wadh Section of National Highway N-25(PDF/480KB)
G20052010PakistanEnvironment IssueThe Project for the Establishment of Environmental Monitoring System(PDF/360KB)
1   2 Next
Copyright © Japan International Cooperation Agency