86 results.
Type of Assistance | Project Start Year* | Type of Evaluation | Evaluation Year | Country | Sector / Theme | Project Name | Report(PDF) | ||
---|---|---|---|---|---|---|---|---|---|
Full Text | Summary | Third Party Opinion | |||||||
G | 2005 | Ex-post Evaluation | 2011 | Afghanistan | Air Transport / Airports | The Project for Construction of the Terminal of Kabul International Airport | 3MB | ||
G | 2006 | Ex-post Evaluation | 2011 | Azerbaijan | Electrical Power | The Project for the Improvement of Mushviq Substation in Baku | 224KB | ||
G | 2007 | Ex-post Evaluation | 2011 | Bangladesh | Weather / Earthquakes | The Project for the Establishment of the Meteorological Radar System at Moulvibazar | 3MB | ||
G | 2007 | Ex-post Evaluation | 2011 | Bangladesh | Roads | The Project for the Provision of Portable Steel Bridges on Upazila and Union Roads | 3MB | ||
G | 2004 | Ex-post Evaluation | 2011 | Benin | Water Supply | The Project for Rural Water Supply (Phase V)Projet d'approvisionnement en eau potable dans la région rurale (Phase V) | 231KB | ||
G | 2005 | Ex-post Evaluation | 2011 | Bhutan | Roads | The Project for Reconstruction of Bridges, Phase 2 | 629KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Bolivia | Health / Health Care | The Project for Improvement of Health Supply Center (CEASS)(El Proyecto de Mejoramiento de la Central de Abastecimiento y Suministros de Salud) | 382KB | ||
G | 2007 | Ex-post Evaluation | 2011 | Bosnia and Herzegovina | Roads | The Project for Improvement of the Equipment for Road Maintenance | 223KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Cambodia | Electrical Power | The Project for the Rural Electrification on Micro-Hydropower in Remote Province of Mondul Kiri | 310KB | ||
G | 2005 | Ex-post Evaluation | 2011 | Cambodia | Education | The Project for the Construction of Primary Schools in Phnom Penh, Phase II | 345KB | ||
G | 2005 | Ex-post Evaluation | 2011 | Cambodia | Agricultural Engineering | The Project for the Rehabilitation of the Kandal Stung Irrigation System | 323KB | ||
G | 2004 | Ex-post Evaluation | 2011 | Cambodia | Electrical Power | The Project for Upgrading and Extension of Electricity Supply Facilities in Phnom Penh | 113KB | ||
G | 2007 | Ex-post Evaluation | 2011 | Cameroon | Communications / Broadcasting / General | The Project for Improvement of Radio Broadcasting Equipment (Projet d'aménagement de l'équipement pour la radiodiffusion) | 287KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Cameroon | Water Resources Development | Project for Rural Water Supply (Phase IV)(Projet d'hydraulique rurale (Phase IV)) | 138KB | ||
G | 2004 | Ex-post Evaluation | 2011 | China | Health / Health Care | The Project for Improvement of Medical Care Level in the Xinjiang Uygur Autonomous Region | 373KB | ||
G | 2004 | Ex-post Evaluation | 2011 | China | Health / Health Care | The Project for Tuberculosis Control in Poor Areas (Phase IV) | 113KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Ecuador | Water Supply | The Prject for Water Supply System in Huaquillas and Arenillas cities | 647KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Ecuador | Water Supply | The Project for Water System Improvement in Ibarra | 444KB | ||
G | 2006 | Ex-post Evaluation | 2011 | Egypt | Water Supply | The Project for Upgrading of El Mahala El Kobra Water Treatment Plant | 517KB | ||
G | 2005 | Ex-post Evaluation | 2011 | El Salvador | Health / Health Care | Project for Rehabilitation of Infrastructure and Equipment of the Rosales National Hospital(El Proyecto de Rehabilitacin de la Infraestructura y Equipamiento del Hospital Nacional Rosales) | 313KB |
scroll