No,region,country,project name,sector,subsector,Special yen (ODA) loan / STEP,Date of approval(year/month/day),Amount of approval(millions; jpy),Main portion Interest rate(%),Main portion Repayment period(years),Main portion Grace period(years),Main portion Tying status,Consulting portion Interest rate(%),Consulting portion Repayment period(years),Consulting portion Grace period(years),Consulting portion Tying status,Executing agency,project url,ex-ante evaluation,ex-post evaluation,other url,Memo 1,"Latin America And The Caribbean","El Salvador","Post Disaster Stand-by Loan by the Government of Japan","Commodity Loans","Commodity Loans","","2016-05-28",5000.00,0.01,"20","6","General, untied",,"","","","Ministry of Finance","https://www2.jica.go.jp/yen_loan/pdf/en/6801/20160530_01.pdf","https://www2.jica.go.jp/en/evaluation/pdf/2016_ES-SB1-1_1_f.pdf","","","" 2,"Latin America And The Caribbean","El Salvador","San Miguel Bypass Construction Project ","Transportation","Roads","","2014-08-20",12595.00,0.95,"20","6","General untied ",0.01,"20","6","General untied ","Ministerio de Obras Públicas, Transporte, Vivienda y Desarrollo Urbano","https://www2.jica.go.jp/yen_loan/pdf/en/6476/20140821.pdf","","","","" 3,"Latin America And The Caribbean","El Salvador","La Union Port Development Project","Transportation","Ports","","2001-10-25",11233.00,2.2,"25","7","General Untied",0.75,"40","10","Bilateral Tied","Comisión Ejecutiva Portuaria Autónoma","https://www2.jica.go.jp/yen_loan/pdf/en/5085/20011025.pdf","","","","" 4,"Latin America And The Caribbean","El Salvador","Electric Power Sector Project (II)","Electric Power And Gas","Transmission Lines And Distribution Systems","","1996-07-29",7585.00,3.00,"30","10","General Untied",3.00,"30","10","General Untied","Comision Ejecutiva Hidroelectrica Del Rio Lempa","","","","","" 5,"Latin America And The Caribbean","El Salvador","Road Improvement Project","Transportation","Roads","","1994-05-24",10332.00,3.00,"30","10","General Untied",3.00,"30","10","General Untied","Ministerio De Obras Publicas","","","","","" 6,"Latin America And The Caribbean","El Salvador","Power Sector Emergency Improvement Project","Electric Power And Gas","Power Plants","","1993-03-19",8817.00,3.00,"30","10","General Untied",3.00,"30","10","General Untied","Comision Ejecutiva Hidroelectrica Del Rio Lempa","","","","","" 7,"Latin America And The Caribbean","El Salvador","Water Supply And Sewerage System Improvement Project","Social Services","Water Supply, Sewerage And Sanitation","","1993-03-19",1210.00,3.00,"30","10","General Untied",3.00,"30","10","General Untied","Administracion Nacional De Acueductos Y Alcantarillados","","","","","" ,Summary,,,,,,,56772,,,,,,,,,,,,,