ODA Loan Project DATA

Please select items from the categories menu below, then press "Search" button.

  • A list of projects will appear based on the selected items.
from
to
Currency of approval

Search Result

697hit. (Total:35pages)

No Region Country Project Name Sector Subsector Special Yen (ODA) Loan / STEP Date of Approval
(year / month / day)
Amount of Approval
(millions; jpy)
Main Portion
(portion applied to reduced interest rate)
Consulting Portion Executing Agency Memo
Interest Rate (%) Repayment Period (years) Grace Period (years) Tying Status Interest Rate (%) Repayment Period (years) Grace Period (years) Tying Status
441 Southeast Asia Indonesia Wondgiri Hydro Power Plant Project Electric Power And Gas Power Plants - 1979/03/29 1,503 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Pt. Pln(Persero)
442 Southeast Asia Indonesia Brantas Middle Reaches River Improvement Project Irrigation And Flood Control Irrigation And Flood Control - 1979/03/15 5,718 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Directorate General Of Water Resources Development, Ministry Of Public Works
443 Southeast Asia Indonesia Engineering Services For The Development Ofsemarang Port Project Transportation Ports - 1979/03/15 480 - - - 2.75 29 10 Partially Untied Directorate General Of Sea Communications, Ministry Of Communications
444 Southeast Asia Indonesia Engineering Services On The Ular River Flood Control And Improvement Project Irrigation And Flood Control Irrigation And Flood Control - 1979/03/15 420 - - - 2.75 29 10 Partially Untied Directorate General Of Water Resources Development, Ministry Of Public Works
445 Southeast Asia Indonesia Equipment Supply For Computer Installation At Central Bureau Social Services Strengthening Of Administrative Management - 1979/03/15 1,480 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Central Bureau Of Statistic
446 Southeast Asia Indonesia Equipment Supply For Replacement And Development Of Dredges Transportation Other Transportation - 1979/03/15 4,150 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Directorate General Of Sea Communications, Ministry Of Communications
447 Southeast Asia Indonesia Way Rarem Irrigation Irrigation And Flood Control Irrigation And Flood Control - 1979/03/15 7,365 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Directorate General Of Water Resources Development, Ministry Of Public Works
448 Southeast Asia Indonesia Widas Irrigation Project Irrigation And Flood Control Irrigation And Flood Control - 1979/03/15 1,833 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Directorate General Of Water Resources Development, Ministry Of Public Works
449 Southeast Asia Indonesia The Wonogiri Irrigation Project Irrigation And Flood Control Irrigation And Flood Control - 1979/02/16 9,800 3.00 29 10 Partially Untied 3.00 29 10 Partially Untied Directorate General Of Water Resources Development, Ministry Of Public Works
450 Southeast Asia Indonesia The Asahan Hydroelectric And Aluminum Project Electric Power And Gas Power Plants - 1979/01/12 6,200 3.00 29 8 Partially Untied 3.00 29 8 Partially Untied Pt. Indonesia Asahan Aluminum
451 Southeast Asia Indonesia The Asahan Hydroelectric And Aluminum Project Electric Power And Gas Power Plants - 1978/12/13 2,150 3.50 29 8 Partially Untied 3.50 29 8 Partially Untied Pt. Indonesia Asahan Aluminum
452 Southeast Asia Indonesia The Engineering Services For Saguling Hydro Power Plant Project Electric Power And Gas Power Plants - 1978/09/26 1,630 - - - 3.00 29 10 Partially Untied Pt. Pln(Persero)
453 Southeast Asia Indonesia The Engineering Services For Jakarta Intra Urban Tollway Construction Project Transportation Roads - 1978/07/31 443 - - - 3.50 19 7 Tied Directorate General Of Highways, Ministry Of Public Works
454 Southeast Asia Indonesia The Engineering Services For Jakarta Intra Urban Tollway Construction Project Transportation Roads - 1978/07/31 19 3.00 24 7 Tied 3.00 24 7 Tied Directorate General Of Highways, Ministry Of Public Works
455 Southeast Asia Indonesia The Asahan Hydroelectric And Aluminum Project Electric Power And Gas Power Plants - 1978/03/31 3,000 3.50 29 8 Partially Untied 3.50 29 8 Partially Untied Pt. Indonesia Asahan Aluminum
456 Southeast Asia Indonesia The East Java Electric Power Transmission And Distribution Network Project Electric Power And Gas Transmission Lines And Distribution Systems - 1978/03/31 4,900 2.75 29 10 Partially Untied 2.75 29 10 Partially Untied Pt. Pln(Persero)
457 Southeast Asia Indonesia The East Java Electric Power Transmission And Distribution Network Project Electric Power And Gas Transmission Lines And Distribution Systems - 1978/03/31 10,512 3.00 29 10 Partially Untied 3.00 29 10 Partially Untied Pt. Pln(Persero)
458 Southeast Asia Indonesia The Engineering Services For The Development Of Ujung Pandan Mining And Manufacturing Manufacturing - 1978/03/31 336 - - - 3.00 29 10 Partially Untied Ministry Of Industry
459 Southeast Asia Indonesia The Asahan Hydroelectric And Aluminum Project Electric Power And Gas Power Plants - 1978/02/23 13,700 3.50 30 8 Partially Untied 3.50 30 8 Partially Untied Pt. Indonesia Asahan Aluminum
460 Southeast Asia Indonesia The Equipment Supply For Distribution Network Electric Power And Gas Transmission Lines And Distribution Systems - 1978/02/23 2,240 3.00 30 10 Partially Untied 3.00 30 10 Partially Untied Pt. Pln(Persero)