Please select items from the categories menu below, then press "Search" button.
- A list of projects will appear based on the selected items.
Search Result
697hit. (Total:35pages)
No | Region | Country | Project Name | Sector | Subsector | Special Yen (ODA) Loan / STEP | Date of Approval (year / month / day) |
Amount of Approval (millions; jpy) |
Main Portion (portion applied to reduced interest rate) |
Consulting Portion | Executing Agency | Memo | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Interest Rate (%) | Repayment Period (years) | Grace Period (years) | Tying Status | Interest Rate (%) | Repayment Period (years) | Grace Period (years) | Tying Status | |||||||||||
441 | Southeast Asia | Indonesia | Wondgiri Hydro Power Plant Project | Electric Power And Gas | Power Plants | - | 1979/03/29 | 1,503 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Pt. Pln(Persero) | |
442 | Southeast Asia | Indonesia | Brantas Middle Reaches River Improvement Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1979/03/15 | 5,718 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Water Resources Development, Ministry Of Public Works | |
443 | Southeast Asia | Indonesia | Engineering Services For The Development Ofsemarang Port Project | Transportation | Ports | - | 1979/03/15 | 480 | - | - | - | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Sea Communications, Ministry Of Communications | ||
444 | Southeast Asia | Indonesia | Engineering Services On The Ular River Flood Control And Improvement Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1979/03/15 | 420 | - | - | - | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Water Resources Development, Ministry Of Public Works | ||
445 | Southeast Asia | Indonesia | Equipment Supply For Computer Installation At Central Bureau | Social Services | Strengthening Of Administrative Management | - | 1979/03/15 | 1,480 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Central Bureau Of Statistic | |
446 | Southeast Asia | Indonesia | Equipment Supply For Replacement And Development Of Dredges | Transportation | Other Transportation | - | 1979/03/15 | 4,150 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Sea Communications, Ministry Of Communications | |
447 | Southeast Asia | Indonesia | Way Rarem Irrigation | Irrigation And Flood Control | Irrigation And Flood Control | - | 1979/03/15 | 7,365 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Water Resources Development, Ministry Of Public Works | |
448 | Southeast Asia | Indonesia | Widas Irrigation Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1979/03/15 | 1,833 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Directorate General Of Water Resources Development, Ministry Of Public Works | |
449 | Southeast Asia | Indonesia | The Wonogiri Irrigation Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1979/02/16 | 9,800 | 3.00 | 29 | 10 | Partially Untied | 3.00 | 29 | 10 | Partially Untied | Directorate General Of Water Resources Development, Ministry Of Public Works | |
450 | Southeast Asia | Indonesia | The Asahan Hydroelectric And Aluminum Project | Electric Power And Gas | Power Plants | - | 1979/01/12 | 6,200 | 3.00 | 29 | 8 | Partially Untied | 3.00 | 29 | 8 | Partially Untied | Pt. Indonesia Asahan Aluminum | |
451 | Southeast Asia | Indonesia | The Asahan Hydroelectric And Aluminum Project | Electric Power And Gas | Power Plants | - | 1978/12/13 | 2,150 | 3.50 | 29 | 8 | Partially Untied | 3.50 | 29 | 8 | Partially Untied | Pt. Indonesia Asahan Aluminum | |
452 | Southeast Asia | Indonesia | The Engineering Services For Saguling Hydro Power Plant Project | Electric Power And Gas | Power Plants | - | 1978/09/26 | 1,630 | - | - | - | 3.00 | 29 | 10 | Partially Untied | Pt. Pln(Persero) | ||
453 | Southeast Asia | Indonesia | The Engineering Services For Jakarta Intra Urban Tollway Construction Project | Transportation | Roads | - | 1978/07/31 | 443 | - | - | - | 3.50 | 19 | 7 | Tied | Directorate General Of Highways, Ministry Of Public Works | ||
454 | Southeast Asia | Indonesia | The Engineering Services For Jakarta Intra Urban Tollway Construction Project | Transportation | Roads | - | 1978/07/31 | 19 | 3.00 | 24 | 7 | Tied | 3.00 | 24 | 7 | Tied | Directorate General Of Highways, Ministry Of Public Works | |
455 | Southeast Asia | Indonesia | The Asahan Hydroelectric And Aluminum Project | Electric Power And Gas | Power Plants | - | 1978/03/31 | 3,000 | 3.50 | 29 | 8 | Partially Untied | 3.50 | 29 | 8 | Partially Untied | Pt. Indonesia Asahan Aluminum | |
456 | Southeast Asia | Indonesia | The East Java Electric Power Transmission And Distribution Network Project | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1978/03/31 | 4,900 | 2.75 | 29 | 10 | Partially Untied | 2.75 | 29 | 10 | Partially Untied | Pt. Pln(Persero) | |
457 | Southeast Asia | Indonesia | The East Java Electric Power Transmission And Distribution Network Project | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1978/03/31 | 10,512 | 3.00 | 29 | 10 | Partially Untied | 3.00 | 29 | 10 | Partially Untied | Pt. Pln(Persero) | |
458 | Southeast Asia | Indonesia | The Engineering Services For The Development Of Ujung Pandan | Mining And Manufacturing | Manufacturing | - | 1978/03/31 | 336 | - | - | - | 3.00 | 29 | 10 | Partially Untied | Ministry Of Industry | ||
459 | Southeast Asia | Indonesia | The Asahan Hydroelectric And Aluminum Project | Electric Power And Gas | Power Plants | - | 1978/02/23 | 13,700 | 3.50 | 30 | 8 | Partially Untied | 3.50 | 30 | 8 | Partially Untied | Pt. Indonesia Asahan Aluminum | |
460 | Southeast Asia | Indonesia | The Equipment Supply For Distribution Network | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1978/02/23 | 2,240 | 3.00 | 30 | 10 | Partially Untied | 3.00 | 30 | 10 | Partially Untied | Pt. Pln(Persero) |
scroll