ODA Loan Project DATA

Please select items from the categories menu below, then press "Search" button.

  • A list of projects will appear based on the selected items.
from
to
Currency of approval

Search Result

697hit. (Total:35pages)

No Region Country Project Name Sector Subsector Special Yen (ODA) Loan / STEP Date of Approval
(year / month / day)
Amount of Approval
(millions; jpy)
Main Portion
(portion applied to reduced interest rate)
Consulting Portion Executing Agency Memo
Interest Rate (%) Repayment Period (years) Grace Period (years) Tying Status Interest Rate (%) Repayment Period (years) Grace Period (years) Tying Status
81 Southeast Asia Indonesia Lower Solo River Improvement Project(II)(PDF) Irrigation And Flood Control Irrigation And Flood Control - 2005/03/31 9,345 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Water Resources, Ministry of Public Works
82 Southeast Asia Indonesia North Java Corridor Flyover Project(PDF) Transportation Roads STEP 2005/03/31 4,287 0.4 40 10 Tied 0.4 40 10 Tied Directorate General of Regional Infrastructure, Ministry of Public Works
83 Southeast Asia Indonesia Tanjung Priok Access Road Construction Project(I)(PDF) Transportation Roads STEP 2005/03/31 26,306 0.4 40 10 Tied 0.4 40 10 Tied Directorate General of Regional Infrastructure, Ministry of Public Works
84 Southeast Asia Indonesia Ulubelu Geothermal Power Plant Project(PDF) Electric Power And Gas Power Plants - 2005/03/31 20,288 0.75 40 10 General Untied 0.75 40 10 General Untied PT. PLN (Persero)
85 Southeast Asia Indonesia Urgent Disaster Reduction Project for Mt. Merapi / Progo River Basin and Mt. Bawakaraeng(PDF) Irrigation And Flood Control Irrigation And Flood Control - 2005/03/31 16,436 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Water Resources, Ministry of Public Works
86 Southeast Asia Indonesia Development Policy Loan(PDF) Commodity Loans Commodity Loans - 2005/03/28 10,794 1.3 30 10 - - - - Ministry of Finance
87 Southeast Asia Indonesia Lahendong Geothermal Power Plant Project(PDF) Electric Power And Gas Power Plants STEP 2004/03/31 5,866 0.75 40 12 Tied 0.75 40 12 Tied Pt.Pln
88 Southeast Asia Indonesia Maritime Telecommunication System Development Project(IV)(PDF) Transportation Marine Transportation - 2004/03/31 5,567 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Sea Communications,Ministry of Communications
89 Southeast Asia Indonesia Railway Double Tracking on Java South Line(II)(PDF) Transportation Railways - 2004/03/31 10,348 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Land Communications,Ministry of Communications
90 Southeast Asia Indonesia Rehabilitation and Improvement Project of Jakarta Fishing Port(PDF) Agriculture, Forestry And Fisheries Fisheries - 2004/03/31 3,437 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Capture Fisheries,Ministry of Marine Affairs and Fisheries
91 Southeast Asia Indonesia Semarang Power Plant Rehabilitation and Gasification Project(PDF) Electric Power And Gas Power Plants - 2004/03/31 8,685 0.75 40 10 General Untied 0.75 40 10 General Untied Pt.Pln
92 Southeast Asia Indonesia Surabaya Airport Construction Project(II)(PDF) Transportation Airports - 2004/03/31 15,007 1.8 30 10 General Untied 1.8 30 10 General Untied Directorate General of Air Communications.Ministry of Communications
93 Southeast Asia Indonesia Tanjung Priok Gas Fired Power Station Extension Project(PDF) Electric Power And Gas Power Plants - 2004/03/31 58,679 1.3 30 10 General Untied 1.3 30 10 General Untied Pt.Pln
94 Southeast Asia Indonesia The Urgent Rehabilitation Project of Tanjung Priok Port(PDF) Transportation Ports - 2004/03/31 12,052 1.3 30 10 General Untied 1.3 30 10 General Untied Directorate General of Sea Communications,Ministry of Communications
95 Southeast Asia Indonesia Muara Karang Gas Power Plant Project(PDF) Electric Power And Gas Power Plants - 2003/07/22 55,750 1.8 30 10 General Untied - - - Pt. Pln
96 Southeast Asia Indonesia Muara Tawar Gas Fired Power Plant Extension Project(PDF) Electric Power And Gas Power Plants - 2003/07/22 18,182 1.8 30 10 General Untied - - - Pt.Pln
97 Southeast Asia Indonesia South Sumatra-West Java Gas Pipeline Project(PDF) Electric Power And Gas Gas Special Yen (ODA) Loan 2003/03/27 49,088 0.95 40 10 Japan Tied 0.75 40 10 Bilateral Tied PT Perusahaan Gas Negara
98 Southeast Asia Indonesia Decentralized Irrigation System Improvement Project in Eastern Region of Indonesia(PDF) Irrigation And Flood Control Irrigation And Flood Control - 2002/10/10 27,035 1.8 30 10 General Untied 0.75 40 10 Bilateral Tied Directorate General of Water Resources, Ministry of Settlements and Regional Infrastructure
99 Southeast Asia Indonesia Decentralized Irrigation System Improvement Project in Eastern Region of Indonesia(PDF) Irrigation And Flood Control Irrigation And Flood Control - 2002/10/10 27,035 1.8 30 10 General Untied 0.75 40 10 Bilateral Tied Directorate General of Water Resources, Ministry of Settlements and Regional Infrastructure
100 Southeast Asia Indonesia Water Resources Existing Facilities Rehabilitation and Capacity Improvement Project(PDF) Irrigation And Flood Control Irrigation And Flood Control - 2002/10/10 14,696 1.8 30 10 General Untied 0.75 40 10 Bilateral Tied Directorate General of Water Resources, Ministry of Settlement and Regional Infrastructure