ODA Loan Project DATA

Please select items from the categories menu below, then press "Search" button.
A list of projects will appear based on the selected items.

Project name (Even only a part of the project name can be retrieved.)
Region

Country

Sector

Subsector

Special yen (ODA) loan / STEP
Year of approval from to *Financial Year
  

The information retrieved from this ODA loan project search system may contain abridged statistical figures. For more complete and accurate data, please refer to press releases, annual reports and other statistical materials.



Search result

 

13 hit. (Total:1pages)

  Download

No Region Country Project name Sector Subsector Special yen (ODA) loan / STEP Date of approval
(year/month/day)
Amount of approval
(millions; jpy)
Main portion
(portion applied to reduced interest rate)
Consulting portion Executing agency Memo
Interest rate(%) Repayment period(years) Grace period(years) Tying status Interest rate(%) Repayment period(years) Grace period(years) Tying status
1 South Asia Nepal Nagdhunga Tunnel Construction Project Transportation Roads - 2016/12/22 16,636 0.01 40 10 General untied 0.01 40 10 General untied Ministry of Physical Infrastructure and Transport  Ex-Ante Evaluation
2 South Asia Nepal Emergency Housing Reconstruction Project Social Services Urban/Rural Community Infrastructure - 2015/12/21 12,000 0.01 40 10 General untied 0.01 40 10 General untied Reconstruction Authority (provisional)  Ex-Ante Evaluation
3 South Asia Nepal Emergency School Reconstruction Project Social Services Education - 2015/12/21 14,000 0.01 40 10 General untied 0.01 40 10 General untied Reconstruction Authority (provisional)  Ex-Ante Evaluation
4 South Asia Nepal Tanahu Hydropower Project Electric Power And Gas Power Plants - 2013/03/13 15,137 0.01 40 10 General untied 0.01 40 10 - Tanahu Hydropower Limited  Ex-Ante Evaluation
5 South Asia Nepal Melamchi Water Supply Project Social Services Water Supply, Sewerage And Sanitation - 2001/03/30 5,494 1.00 30 10 General Untied 0.75 40 10 General Untied Melamchi Water Supply Development Board Under The Ministry Of Physical Planning And Works
6 South Asia Nepal Kali Gandaki A Hydroelectric Project Electric Power And Gas Power Plants - 1996/10/14 16,916 1.00 30 10 General Untied - - - Nepal Electricity Authority
7 South Asia Nepal Kulekhani Disaster Prevention Project (II) Irrigation And Flood Control Irrigation And Flood Control - 1996/05/17 3,484 1.00 30 10 General Untied 1.00 30 10 General Untied Nepal Electricity Authority
8 South Asia Nepal Kulekhani Disaster Prevention Project Irrigation And Flood Control Irrigation And Flood Control - 1990/10/05 2,710 1.00 30 10 General Untied 1.00 30 10 General Untied Nepal Electricity Authority
9 South Asia Nepal Udaipur Cement Project Mining And Manufacturing Manufacturing - 1987/10/14 18,770 1.25 30 10 Partially Untied 1.25 30 10 Partially Untied Udaipur Cement Industries Ltd.
10 South Asia Nepal Second Kulekhani Hydroelectric Project (II) Electric Power And Gas Power Plants - 1983/06/09 4,806 1.25 30 10 Partially Untied 1.25 30 10 Partially Untied The Electricity Department, Ministry Of Water Resources
11 South Asia Nepal Second Kulekhani Hydroelectric Project Electric Power And Gas Power Plants - 1982/04/20 7,344 1.25 30 10 Partially Untied - - - The Electricity Department, Ministry Of Water Resources
12 South Asia Nepal Kulekhani Hydroelectric Project (II) Electric Power And Gas Power Plants - 1978/12/27 1,005 2.75 30 10 Compound Untied - - - The Kulekhani Hydro-Electric Development Board
13 South Asia Nepal Kulekhani Hydroelectric Project Electric Power And Gas Power Plants - 1976/03/16 3,000 2.75 30 10 Partially Untied - - - The Electricity Department Of The Ministry Of Water And Power

Copyright © Japan International Cooperation Agency