Please select items from the categories menu below, then press "Search" button.
- A list of projects will appear based on the selected items.
Search Result
319hit. (Total:16pages)
| No | Region | Country | Project Name | Sector | Subsector | Special Yen (ODA) Loan / STEP | Date of Approval (year / month / day) |
Amount of Approval (millions; jpy) |
Main Portion (portion applied to reduced interest rate) |
Consulting Portion | Executing Agency | Memo | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Interest Rate (%) | Repayment Period (years) | Grace Period (years) | Tying Status | Interest Rate (%) | Repayment Period (years) | Grace Period (years) | Tying Status | |||||||||||
| 241 | Southeast Asia | Philippines | Commodity Loan (VIII) | Commodity Loans | Commodity Loans | - | 1984/05/07 | 35,202 | 3.50 | 20 | 5 | General Untied | - | - | - | The Central Bank Board Of Liquidators | ||
| 242 | Southeast Asia | Philippines | Metro Manila Drainage System Rehabilitation Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1984/05/07 | 3,012 | 3.50 | 30 | 10 | General Untied | 3.50 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
| 243 | Southeast Asia | Philippines | Postal Equipment Procurement Project (II) | Telecommunications | Telecommunications | - | 1984/05/07 | 1,381 | 3.50 | 30 | 10 | General Untied | 3.50 | 30 | 10 | Partially Untied | Bureau Of Posts | |
| 244 | Southeast Asia | Philippines | Bohol Irrigation Project (Stage I) | Irrigation And Flood Control | Irrigation And Flood Control | - | 1983/09/09 | 4,600 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | National Irrigation Administration | |
| 245 | Southeast Asia | Philippines | Engineering Services For Port Irene Development Project | Transportation | Ports | - | 1983/09/09 | 240 | - | - | - | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | ||
| 246 | Southeast Asia | Philippines | Extra High Voltage Transmission Line Project(Southern Luzon) (Stage II) | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1983/09/09 | 9,900 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | National Power Corporation | |
| 247 | Southeast Asia | Philippines | Leyte Geothernal Development Project (II) | Electric Power And Gas | Power Plants | - | 1983/09/09 | 16,370 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | National Power Corporation, Philippine National Oil Company - Energy Development Corporation | |
| 248 | Southeast Asia | Philippines | Metro Manila Radial Road No.10 And Related Roads Project (Stage I ) | Transportation | Roads | - | 1983/09/09 | 5,400 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
| 249 | Southeast Asia | Philippines | Nationwide Flood Control Dredging Project (Telemetering Portion) | Irrigation And Flood Control | Irrigation And Flood Control | - | 1983/09/09 | 1,140 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
| 250 | Southeast Asia | Philippines | Power Plant Barge Project II | Electric Power And Gas | Power Plants | - | 1983/09/09 | 9,600 | 4.00 | 30 | 10 | Tied | 4.00 | 30 | 10 | Tied | National Power Corporation | |
| 251 | Southeast Asia | Philippines | Railcar Maintenance Depot Construction Project | Transportation | Railways | - | 1983/09/09 | 4,500 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Philippine National Railways | |
| 252 | Southeast Asia | Philippines | West Leyte Roads And North-West Leyte Roads Improvement Project | Transportation | Roads | - | 1983/09/09 | 6,300 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
| 253 | Southeast Asia | Philippines | Agro-Industry Technology Transfer Project | Agriculture, Forestry And Fisheries | Agriculture | - | 1982/05/31 | 5,000 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Technology And Livelihood Resource Center | |
| 254 | Southeast Asia | Philippines | Engineering Services For Lower Agusan Development Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1982/05/31 | 330 | - | - | - | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | ||
| 255 | Southeast Asia | Philippines | Engineering Services For Main Line North Rehabilitation Project | Transportation | Railways | - | 1982/05/31 | 490 | - | - | - | 3.00 | 30 | 10 | Partially Untied | Philippine National Railways | ||
| 256 | Southeast Asia | Philippines | Engineering Services For Rural Power Development Project | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1982/05/31 | 670 | - | - | - | 3.00 | 30 | 10 | Partially Untied | National Electrification Administration | ||
| 257 | Southeast Asia | Philippines | Extra High Voltage Transmission Line Project (Southern Luzon) (Stage 1) | Electric Power And Gas | Transmission Lines And Distribution Systems | - | 1982/05/31 | 32,420 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | National Power Corporation | |
| 258 | Southeast Asia | Philippines | Fishing Ports Development Project | Agriculture, Forestry And Fisheries | Fisheries | - | 1982/05/31 | 3,630 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
| 259 | Southeast Asia | Philippines | Flood Forecasting And Warning System For Dam Operation Project | Irrigation And Flood Control | Irrigation And Flood Control | - | 1982/05/31 | 3,600 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Pagasa | |
| 260 | Southeast Asia | Philippines | Metro Manila Traffic Engineering And Management Project | Transportation | Roads | - | 1982/05/31 | 3,860 | 3.00 | 30 | 10 | General Untied | 3.00 | 30 | 10 | Partially Untied | Department Of Public Works And Highways | |
scroll