169 results.
Type of Assistance | Project Start Year* | Type of Evaluation | Evaluation Year | Country | Sector / Theme | Project Name | Report(PDF) | ||
---|---|---|---|---|---|---|---|---|---|
Full Text | Summary | Third Party Opinion | |||||||
T | 2015 | Ex-post Evaluation | 2021 | Cambodia | Roads | The Project for Strengthening Capacity for Maintenance of Roads and Bridges | 315KB | ||
T | 2014 | Ex-post Evaluation | 2023 | Cambodia | Agricultural Engineering | The Project for River Basin Water Resources Utilization in the Kingdom of Cambodia | 405KB | ||
T | 2013 | Ex-post Evaluation | 2020 | Cambodia | Secondary Education | Project for Educational Resource Development in Science and Mathematics at the Lower Secondary Level (STEPSAM3) | 475KB | ||
T | 2013 | Terminal Evaluation | 2016 | Cambodia | Secondary Education | Project for Educational Resource Development in Science and Mathematics at the Lower Secondary Level (STEPSAM3) | 541KB | ||
T | 2013 | Ex-post Evaluation | 2019 | Cambodia | Measurement / Map | Project for Productions of Integrated Digital Terrain Model and Electronic Navigational Chart in the Kingdom of Cambodia | 342KB | ||
T | 2013 | Ex-post Evaluation | 2018 | Cambodia | Business Management | Project for Strategic Strengthening of Small and Medium Enterprise (SME) Support System | 316KB | ||
T | 2012 | Ex-post Evaluation | 2018 | Cambodia | Electrical Power | Project for Improvement of Transmission System Operation and Maintenance | 470KB | ||
T | 2012 | Terminal Evaluation | 2015 | Cambodia | Electrical Power | Project for Improvement of Transmission System Operation and Maintenance | 376KB | ||
T | 2012 | Ex-post Evaluation | 2020 | Cambodia | Water Supply | The Project on the Capacity Building for Water Supply System in Cambodia (Phase 3) | 763KB | ||
T | 2011 | Terminal Evaluation | 2014 | Cambodia | Fisheries | Freshwater Aquaculture Improvement and Extension Project II (FAIEXGrant Aid) in Cambodia | 410KB | ||
T | 2011 | Ex-post Evaluation | 2017 | Cambodia | Urban Transport | Project for Comprehensive Urban Transport Planning in Phnom Penh Capital City | 426KB | ||
T | 2011 | Ex-post Evaluation | 2021 | Cambodia | Forestry / Forest Preservation | Project for Facilitating the Implementation of REDD+ Strategy and Policy | 346KB | ||
T | 2011 | Terminal Evaluation | 2015 | Cambodia | Forestry / Forest Preservation | Project for Facilitating the Implementation of REDD+ Strategy and Policy | 826KB | ||
T | 2011 | Terminal Evaluation | 2014 | Cambodia | Banking / Finance | The Project for Capacity Development of GDT under the Framework of PFM Reform | 167KB | ||
T | 2011 | Terminal Evaluation | 2015 | Cambodia | Higher Education | The Project for Educational Capacity Development of the Institute of Technology of Cambodia | 831KB | ||
T | 2010 | Ex-post Evaluation | 2017 | Cambodia | Agriculture / General | Agricultural Productivity Promotion Project in West Tonle Sap | 314KB | ||
T | 2010 | Terminal Evaluation | 2014 | Cambodia | Agriculture / General | Agricultural Productivity Promotion Project in West Tonle Sap | 875KB | ||
T | 2010 | Ex-post Evaluation | 2018 | Cambodia | Fisheries | Freshwater Aquaculture Improvement and Extension Project Phase 2 | 334KB | ||
T | 2010 | Ex-post Evaluation | 2018 | Cambodia | Statistics | Project on Improving Official Statistics in Cambodia (Phase 3) | 717KB | ||
T | 2010 | Ex-post Evaluation | 2019 | Cambodia | Health / Health Care | Strengthening Human Resources Development System of co-medicals in Cambodia | 339KB |
scroll